Arcelor-Mittal

-Design and construction of a supply system of 138KV for a new hot rolling line of plates;
-Installation of 3 km of 138 KV transmission line;
equipping a new 138KV / 13.8KV 40MVA transformer station;
-Substitution of the measurement and protection system,
extension of the network supervision system;
-Interconnection of the utilities system with the plant-specific generator and sale of surplus energy;
-Complete remote monitoring system for all processing station protection equipment;