Renovation and New Construction of the CPAM de l’Ain Headquarters

Bourg-en-Bresse · 01

Projet

The project involves the complete refurbishment of Building B at the existing CPAM de l’Ain headquarters, together with the construction of the new Building C on the adjacent site. The project is delivered using the Building Information Modelling (BIM) methodology.

Missions

Thermal Engineering & Sustainability – Compliance Requirements:

  • HQE (High Environmental Quality) certification
  • RE2020 compliance
  • E3C1 performance level
  • Integration of circular economy and material reuse principles
  • RE2020 compliance for the new building
  • BBC Effinergie certification criteria for the refurbishment
  • RT Existant compliance to meet the French Tertiary Decree requirements

Heating, Ventilation & Plumbing:

  • Sizing of single-flow and double-flow ventilation systems
  • Sizing of heating and cooling loads using an optimized combination of geothermal energy and air-to-water heat pumps
  • Sizing of domestic hot water, cold water and drainage systems

High-Voltage and Low-Voltage Electrical Systems:

  • MV/LV power supply (Medium Voltage / Low Voltage)
  • Indoor and outdoor lighting design
  • Energy management and monitoring systems
  • EV charging stations, VDI network and Fire Safety System (SSI)

Self-Consumption Photovoltaic Installation:

  • 300 m² – Annual production: 75.8 MWh