Euroelec-Smart Energy speaks the “Bim”
BIM
BIM changes the way contractors, architects, engineers and contractors work. With this model, they can add more information at the beginning of the project and before the changes are made.
Real estate construction does not escape the major innovations generated by design software. The Building Information Modeling BIM is a means of developing, implementing and monitoring construction projects.
This practice is done in five levels of detail starting with the sketch at the building. Because to arrive at a perfectly finished model, it will take a lot of time to model it and count long hours of design. It should be noted that the BIM model is built according to the contribution of the different stakeholders on the work, from the design to the construction. This will allow the different employees to anticipate, optimize and better represent their choices during this time.
Euroelec-Smart Energy through the BIM digital model will reduce the risk of errors that can be committed on a construction site, obtain better collaboration with stakeholders and have a better quality of projects.
The BIM is in fact a database management system, since it makes it possible to inform the project managers on the situation of buildings, premises, offices, shops, to locate the equipment and construction products with their data. Also, to identify the surfaces, to facilitate the supply of the forecast management and to know the frequency of the activities of maintenance of the assets and many other functions.
For Euroelec-Smart Energy, it is an inevitable practice to design, maintain and renovate buildings.
Our objective is to:
The LOD style
Le style LOD définit par The American Institute of Architects dans le « Building Information Modeling Protocol Form » permet de qualifier le niveau de précision d’une maquette.
Illustration of the development levels defined by The American Institute of Architects:
For example, for our villas renovation project in Ibiza, Spain, we were in phase 300. (Phase explained below).
LOD 300 – Precise geometry The model element is graphically represented in the model as a specific system, object or assembly in terms of quantity, size, shape, location and orientation. Non-graphical information can also be attached to the template element. The origin of the project is defined and the element is precisely located with respect to the origin of the project.” UNITED-BIM INC.
CONSTITUTION OF THE DIGITAL DOE
The implementation of works is done by the DOE, (Dossier d’Ouvrages Exécutés Numérique) which is the compilation of all technical, written and graphic documentation. This is what will be handed over by the supervisor to the owner. A verification and VISA procedure is mandatory for each DOE to ensure that everything is in order. It includes the drawings conforming to the execution, the calculation notes, the technical checks, the operating instructions and the quality of the materials used.
BIM: INTERNATIONAL COMPARISON
Internationally, and more specifically in the United States, the improvement of constructions is essential for the efficient research of economic performance of construction sites. As for France, this improvement appears during the internal management of stocks in companies by finding solutions for a possible change in materials prices. It is here that the BIM intervenes, because it is the latter that will allow this realization through computer software to find precisely the implementation of the various components.